PSS 7.4.1
Release 7.4.1 introduces improvements focused on operational visibility, fault analysis and insight interpretation. This release improves how cycle insights are communicated within the platform while also introducing a new export workflow for consolidated Level 1 (L1) and Level 2 (L2) fault analysis.
The goal of these updates is to reduce ambiguity during production investigations, improve visibility into hidden downtime conditions and enable advanced fault reporting.
Cycle insights enhancements

Cycle insights are often used to investigate production instability, interrupted cycles and recurring throughput loss patterns. Previously, the distinction between self-cycle and total-cycle based insights was not always visually explicit, which could lead to interpretation inconsistencies during operational analysis.
This update improves clarity and context within the Cycle Insights experience
What changed
Informational context added for Top Problematic States
An informational tooltip has been added within the Top Problematic States section. This tooltip explains:
"The top problematic states displayed here are calculated only from interrupted cycles"
This provides additional analytical context and helps users correctly interpret why certain states appear disproportionately during cycle analysis.
New excel export report - L1 and L2 faults
Release 7.4.1 introduces a new export report type - L1 and L2 Faults. This report is available under the new "Excel Export" report type while creating a new report
This new export allows users to generate a consolidated Excel report containing:
hard faults (L1)
latent operational issues (L2)
alert occurrences
auto mode drops
manual mode switches
event duration timelines
The objective is to provide a unified operational timeline that improves visibility into production-impacting conditions without requiring manual backend analysis.

Export workflow
Users can now:
This export improves investigation workflows by helping teams answer questions such as:
What alerts occurred during production?
When did Auto mode drop?
Which faults remained active for extended durations?
Which hidden conditions may have contributed to throughput loss?
Where were repeated operator interventions occurring?
The report is designed to improve visibility into hidden downtime conditions while preserving compatibility with existing operational workflows.
Last updated